Argentina Mining's Blog I Latest news on Mining in Argentina

Este blog fue creado para publicar novedades sobre la mineria en Argentina, complementando así nuestro web y presencia en redes sociales. Como todas nuestras actividades, apunta a conectar a la comunidad minera argentina y establecer un ámbito de promoción de la actividad en el mundo, generando oportunidades de negocios.
---
This blog was created to publish news on argentinean mining, thus complementing our website and presence in social networks. As all of our activities, it intends to connect the mining community in Argentina and provide a place to promote the activity in the world, developing business opportunities.
Mostrando entradas con la etiqueta San Juan. Mostrar todas las entradas
Mostrando entradas con la etiqueta San Juan. Mostrar todas las entradas

1 mar 2012

Kestrel Gold Inc.: Surface Sampling Highlights the Near Surface Bulk Tonnage Potential of Gold Mineralization at Huachi Property, Argentina



VANCOUVER, BRITISH COLUMBIA--(Marketwire - Feb. 28, 2012) -

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES. ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF U.S. SECURITIES LAWS.

Kestrel Gold Inc. ("Kestrel" or the "Corporation") (TSX VENTURE:KGC) is pleased to announce the release of the initial results from its surface sampling of road cuts and trenches on its 540 hectare Huachi property in San Juan Province, Argentina (the "Huachi Property") conducted in conjunction with the Corporation's 2011 diamond drilling campaign.

The results from 223 continuous one metre rock chip samples (including QA/QC samples) have been processed and compiled by Kestrel. Sampling was distributed over six lines covering the outcrops found along the roads and trenches on the east hill side of Cerro Los Bronces.

Highlights

Significant new continuous chip road sections include:

* 4.40 g/t Au over 7.0 metres
* 1.61 g/ Au over 13.0 metres
* 0.64 g/t Au over 6.0 metres

The results suggest that the best surface samples in terms of higher gold grade are where NW structures intersect what is believed to be a continuation of the NNE trending "Sentazon Structure". While the significant values reported are not true widths of the "Sentazon Structure" itself, the sample intervals stated may approximate true widths across NW trending mineralized structures.

The significant values stated are from two parallel northeast trending road cuts up to 30 metres apart where 71 and 64 one metre continuous chip samples were taken respectively. In this area, vuggy textured silica veins are hosted in a partially brecciated, fractured and highly altered, quartz-feldspar porphyry.

Geological Setting

The gold bearing quartz-feldspar porphyry rocks sampled display a dominant NW trending fracture/cleavage with strong argillic alteration that overprints propylitic alteration.

The occurrence and recognition of these mineralized structural alignments oblique to the direction of the major mineralized structures already known, opens up, in the opinion of management, new possibilities for exploration of other higher grade mineralized zones with the view to further increasing the volume of the gold bearing component at the Huachi Property.

Results for drill holes 11-HU-21 to 11-HU-23 including those targeting the "Sentazon Structure" as well as results from further surface trench sampling of the road cuts are anticipated to be released shortly, following QA/QC procedures and also pending further laboratory reports. Maps relating to the content of this news release showing the distribution of sample lines and the relative locations of samples will be posted on the Corporation's website.

Quality Assurance/Quality Control

Samples were submitted to Alex Stewart Assayers Argentina S.A. in Mendoza, Argentina an ISO 9000-2000 accredited laboratory. Gold and silver results were determined using standard fire assay techniques on a 30 gram sample with a gravimetric finish for gold and silver. In addition to this, ICP-AR (Aqua Regia digestion) analysis was performed on 39 elements. Gustavo Fernandez P.Geo of UAKO Geological Consultants supervised and assessed the QA/QC procedures and data in compliance with National Instrument 43-101 requirements.

About Kestrel Gold Inc.

Kestrel is a gold exploration company headquartered in Canada. Its two principal projects are the King Solomon Dome project in Canada's Yukon Territory and the Huachi project in Argentina. Kestrel (KGC) is listed on the TSX Venture Exchange.

Technical aspects of this news release have been reviewed and approved by W.A. Taylor, P.Geo., hereby designated as a qualified person under National Instrument 43-101.

Cautionary Statements

This news release contains "forward-looking information" within the meaning of applicable securities laws, including with respect to the potential mineralization of the Huachi Property and possible future exploration of the Huachi property and the timing of the release of further sampling results. Readers are cautioned to not place undue reliance on forward-looking statements. Forward-looking statements are based on certain key assumptions made by the Corporation, including assumptions based on the Corporation's current exploration results, assumptions related to obtaining sufficient financing and other resources to carry out any future exploration and timing to obtain reportable results. Actual results and developments may differ materially from those contemplated by these statements depending on, among other things, the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting exploration results and other geological data and the ability of the Corporation to obtain the funds and resources required to carry out further exploration. The forward-looking statements in this press release are made as of the date of this release and the Corporation undertakes no obligation to update publicly or revise any forward looking statements whether as a result of new information or otherwise, except as required by applicable securities laws. The Corporation undertakes no obligation to comment on analyses, expectations or statements made by third parties in respect of the Corporation or its financial or operating results or (as applicable) its securities.

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this news release.
Contact Information



Kestrel Gold Inc.
Kevin Nephin
604-824-6056 or 604-799-2456
kvnephin@telus.net
www.kestrelgold.com



15 sept 2011

Marifil Completes Purchase of Key San Roque Claims

TORONTO, ONTARIO--(Marketwire - Sept. 14, 2011) - Minsud Resources Corp. (TSX VENTURE:MSR) ("Minsud" or the "Company") is pleased to announce results from Phase I drilling program at the Brechas Vacas property within Chita Valley Project in Argentina strategically located in the world-class El Indio mining district of Chile and Argentina where the Pascua-Lama and Veladero mines (Barrick) and the Del Carmen project (Malbex Resources) are located.

The Chinchillones target is silver (±Au) and base metals mineralized corridor (system of sheeted veins) striking NE hosted in Upper Carboniferous sandstones and shales. Within the northernmost part of the corridor drill hole ChS1104 intercepted 72.0 g/t silver and 0.23 g/t gold over 13.0 m and 393.0 g/t silver and 0.44 g/t gold over 1 meter confirming the continuity up to 220 m depth of a mineralized corridor previously found by surface trenching and drill hole MSA08C (see section on Exhibit I and location map on Exhibit II) over an area of 300 m long by 30 m wide. The veins are composed of crystalline, vuggy quartz often with comb-like structures infilled with sulphides and in some cases the vein structures are wider than 10 m with the individual veins three to four cm wide (locally up to 80 cm). Those thin veins were intersected in Chs1101 grading 105.0 g/t Ag, 0.18 g/t Au, 1.34 % Cu, 0.34% Pb, 1.56% Zn over 2 meters,, Ch1103 intersected 79.0 g/t Ag, 0.31 g/t Au, 0.13 % Cu, 6.71 % Pb, 20.45% Zn over 1 meter and CHS1105 intersected 136.0 g/t Ag, 0.40 g/t Au, 2.07 % Pb, 6.96 % Zn over 2 meters.




Roberto Milanese, Minera Sud Argentina S.A. VP Exploration said "it is remarkable the continuity of the Ag + Au + Base metals mineralization within the corridor, remaining open along strike and at depth, warranting further drilling."

Mr. Carlos Massa, President and CEO said "we are pleased to report that given this promising results Minera Sud Argentina S.A (MSA), has already exercised its option to buy the 50% of the Brechas Vacas´s mining rights for the amount of USD 210,000. The payment will be effective concurrently with the transfer of 100% mining rights to a trust to be designated by MSA and the assignment of 50% of the beneficial rights to MSA, Minsud wholly owned subsidiary, within the next 90 days."

Mr. C. Gustavo Fernandez, Professional Geoscientist in the Province of Ontario, is the Qualified Person as defined by NI 43-101. Mr. Fernandez has read and approved the contents of this release.

To view Exhibit I: Section please visit the following link:

http://media3.marketwire.com/docs/Minsud.jpg.

To view Exhibit II: Drilling Program Targets Phase I please visit the following link:

http://media3.marketwire.com/docs/minsud%202.jpg.

About Minsud Resources Corp.:

Minsud is a mineral exploration company focused on exploring its flagship Chita Valley project, primarily for gold, silver and copper in San Juan Province, Argentina.

Additionally, the Company holds a portfolio of approximately 75,000 ha of 100% owned exploration properties in Patagonia. Most of the key properties held by the Company are located in mining friendly provinces like San Juan and Santa Cruz, Argentina.

Quality Assurance/Quality Control: Drill core samples were submitted to Alex Stewart (Assayers), Argentina S.A. an ISO 9000-2000 accredited laboratories located in Mendoza, Argentina. Gold and silver results were determined using standard fire assay techniques on a 50 gram sample with a gravimetric finish for gold and silver. MINSUD's QA/QC program includes the insertion of blanks, standards and duplicates into the sample stream for Chita drill holes.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements about strategic plans, spending commitments, future operations, results of exploration, anticipated financial results, future work programs, capital expenditures and objectives. Forward-looking information is necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information, including the risks identified in the Company's TSXV Filing Statement dated under the heading "Risk Factors". There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this press release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contact Information



Minsud Resources Corp.
Carlos Massa
President and Chief Executive Officer
+54-11-4328-4067
cmassa@minsud.com

14 sept 2011

Malbex Releases First Resource Estimate for Rojo Grande Gold-Silver Deposit


TORONTO, ONTARIO--(Marketwire - Sept. 12, 2011) - Malbex Resources Inc. (TSX VENTURE:MBG) today announced the first National Instrument (NI) 43-101-compliant, inferred mineral resource estimate for the Rojo Grande zone at its Del Carmen Norte high-sulphidation gold-silver project in San Juan, Argentina. The in-pit, inferred resource is 25.4 million tonnes of oxide material grading 1.00 g/t gold and 13.3 g/t silver for 816,600 ounces of contained gold and 10.9 million ounces of contained silver, at a lower average gold equivalent cutoff grade of 0.3 g/t. Drilling in the coming field season will aim to extend and expand the deposit, which remains open to the southwest. Drilling will also target areas within the modelled pit that have not yet been tested and are currently assigned as waste.

The table below summarises the inferred in-pit mineral resource estimate:





(1) Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. (2) The quantity and grade of reported inferred resources in this estimation are conceptual in nature and there has been insufficient exploration to define these inferred resources as an indicated or measured mineral resource. It is uncertain if further exploration will result in upgrading them to an indicated or measured mineral resource category. (3) The 0.3 g/t gold equivalent cutoff grade was derived from an assumed open pit/heap leach operation with recoveries of 70% for gold and 40% for silver, a mining cost of US$1.50/tonne for ore and $1.40/tonne waste, process cost of US$3.50/tonne and general & administrative costs of US$2.50/tonne. The costs were derived from similar operations and the recoveries from initial metallurgical testwork. Assumed prices of $1,125/oz for gold and $20/oz for silver, based on 3-year trailing averages, were also employed.

"We're very pleased with this first-ever resource estimate for our flagship Del Carmen project," said Tim Warman, President and CEO. "The near-surface, oxide mineralization at Rojo Grande occupies only one small area within the much larger Del Carmen Norte alteration system, and the deposit remains open to the southwest. This season's field program will aim to expand Rojo Grande and test additional targets via 15,000 metres of drilling as well as generate new targets using geophysical surveying to better identify favourable alteration. Sampling for the second phase of metallurgical test work on Rojo Grande will also commence shortly."

Notes on the methodology of estimation of the inferred resource:

* The inferred resource estimate was carried out by Micon International Limited (Micon).
* The database comprised a total of 23 diamond drill holes, 4,185 metres of mainly HQ drilling (lesser amounts of PQ and NQ) and 3,446 gold and silver assays.
* An interpreted mineralised envelope was modeled into a wireframed solid in Gemcom, Approximate dimensions of the envelope were 750 metres in length (northeast-southwest), 80 to 200 metres in width (northwest-southeast), and up to 280 metres in vertical extent.
* Estimates are based on a parent cell dimension of 20 metres east, 20 metres north and 5 metres vertically.
* Grade interpolation was based on 5.0 metre composites cut to a maximum of 12.6 g/t gold and 161 g/t silver.
* Tonnage estimates are based on 71 bulk density measurements carried out by Malbex which were interpolated into the mineralized domain of the block model. Bulk density values for the Rojo Grande mineralised rock ranged from 1.68 to 2.67 tonnes/m3. The incompetent nature of certain zones of powdery quartz-alunite alteration made it difficult to obtain reliable density measurements for a small portion of the mineralized envelope. Due to this rock condition, and after a statistical analysis of the frequency of density results, a low-value outlier population was identified and all density measurements less than 2 tonnes/m3 were not used. All waste blocks and a small volume that did not get an interpolated density value were assigned the average density of 2.32 tonnes/m3.
* The resource at a 1.00 g/t gold grade was reported within a preliminary conceptual open-pit mining envelope with the purpose of delineating mineralization with a reasonable prospect of economic extraction. The Whittle open pit model was constructed using a gold price of US$1,125/oz, and heap leach gold recoveries of 70%. The resulting, unoptimized pit has a strip ratio of 2.09:1.

The mineral resources in this press release were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council December 11, 2005.

Messer's. B. Terrence Hennessey, P.Geo., and Richard Gowans, P.Eng., of Micon will be the authors of an NI 43-101-compliant Technical Report on the Mineral Resource Estimate for the Rojo Grande deposit, to be filed within 45 days of this news release. They are Qualified Persons in accordance with NI 43-101, and are responsible for the information presented in this news release. Mr. Hennessey is independent of Malbex as defined by NI 43-101.

Metallurgy

Malbex has previously (PR of January 20, 2011) reported that results from preliminary metallurgical testing (bottle roll) show average gold recoveries of 76.5% for five Del Carmen Norte samples (three from Rojo Grande, two from Naciente Quebrada Pedregosa target). The above quoted recoveries are for material crushed to 6.3 millimetres (mm). Four of five 6.3 mm samples range from 78.3% to 83.1% gold recovery while the fifth sample showed 61.4% recovery. Overall, the test results indicate good potential for heap leach cyanidation treatment and for whole ore milling/cyanidation treatment of the materials represented by the five composite samples. Silver recoveries range from 15% to 65% for those samples with detectable silver (four of five) and were generally higher for milled compared to crushed material. Importantly, cyanide consumption was low with a reported average for all samples of 0.16 kg/t.

Sample selection and collection for follow-up metallurgical testing is currently underway. This next round of testing will involve several column leach tests to evaluate the amenability, feed size sensitivity and ore variability of Rojo Grande ores to heap leaching. The testing will also include additional bottle roll tests, petrographic characterization (gold deportment), load and permeability testing and evaluation of the acid generating ability of the leached residues.

Further information on the Del Carmen project, including maps, sections and a complete assay table, can be accessed at www.malbex.ca/Projects/Del_Carmen.

Mr. B. Terrence Hennessey, P.Geo., of Micon is a Professional Geoscientist in the Province of Ontario, and is the Qualified Person as defined by NI 43-101 responsible for the technical information presented in this news release. Dr. Peter Stewart, P.Geo., is the Qualified Person responsible for the conduct of Malbex's exploration program.

Technical information

Diamond drill hole samples consist of core that is sawn in half by electric saw on site. Core samples are sealed in new plastic bags, which are inserted into rice sacks for transport by Malbex personal or commercial trucking service to ALS Global prep lab in Mendoza. All samples are crushed and pulped and powders sent by ALS to one of their laboratories (typically La Serena, Chile or North Vancouver, BC). Fire assay for gold is conducted on 30 gram (g) pulps with atomic absorption finish. Over limits (>10 g/t gold) are fire assayed with gravimetric finish. In addition, all samples receive multi-element analysis including silver by ICP after aqua regia digestion and mercury by cold vapour atomic absorption.

Malbex's quality assurance-quality control (QA-QC) program consists of the insertion in every 20 samples of at least one certified standard of known gold content, one blank (sample known to consist of very low levels of gold to ensure adequate cleaning of the sample preparation equipment between samples) and one field duplicate. Samples of significant drill intercepts will be sent to two additional independent laboratories to verify gold and silver analyses when necessary. Metallic screen fire analyses for gold will also be run regularly on discovered mineralization as an additional QA-QC check. The half core remaining after sampling is stored in a Malbex-run facility in San Juan for verification and reference purposes.

About Malbex

Malbex Resources Inc. is a gold exploration company led by experienced management and directors with projects in Argentina and Peru. In April 2010, Malbex made a near-surface, gold-silver oxide discovery at Del Carmen, its lead project in Argentina. Released in September 2011, the first-ever National Instrument 43-101-compliant, inferred mineral resource estimate for the Rojo Grande zone at Del Carmen measured 25.4 million tonnes grading 1.00 g/t gold and 13.3 g/t silver for 816,600 ounces of contained gold and 10.9 million ounces of contained silver. The Del Carmen project is located in the El Indio Gold Belt, which contains more than 35 million ounces of gold in current reserves and past production, including Barrick's Veladero mine and Pascua-Lama project. For more information, please visit www.malbex.ca.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements about strategic plans, spending commitments, future operations, results of exploration, anticipated financial results, future work programs, capital expenditures and objectives. Forward-looking information is necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information, including the risks identified in the Company's annual information form under the heading "Risk Factors". There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this press release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contact Information



Malbex Resources Inc.
Tim Warman
President and Chief Executive Officer
(416) 628-0215
ir@malbex.ca

Malbex Resources Inc.
Marla Gale
VP Investor Relations
(416) 628-0215
ir@malbex.ca
www.malbex.ca

21 ago 2011

Kestrel Provides Further Exploration Update



VANCOUVER, BRITISH COLUMBIA--(Marketwire - Aug. 18, 2011) -

NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES. ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF U.S. SECURITIES LAWS.

Kestrel Gold Inc. ("Kestrel" or the "Corporation") (TSX VENTURE:KGC) is pleased to provide an update related to exploration activities on its one hundred (100%) percent owned Huachi Property, in San Juan Province, north western Argentina and on its gold exploration properties in the Yukon, Canada, that Kestrel holds an option to acquire a 100% interest.

At Huachi, the first two drill holes (with HQ core) have been completed at the North Ridge Road Cut Zone and the NE Agua Amarga Headwaters Zone, respectively. The North Ridge Road Cut Zone is a gold-mineralized area (that has returned surface rock sample values of up to 12.93 g/t Au – see May 13, 2011 news release) on the northeast side of the East Peak Stock. At the North Ridge Road Cut Zone, gold mineralization occurs in several limonitic shear zones (with variable attitudes) that intersect highly argillically altered diorite host rock. Diamond drilling in this zone is intended to cut north-south and north-east trending near-vertical precious-metal bearing structures. The Agua Amarga Zone also has epithermal textures, alteration and gold mineralization hosted in breccias similar in nature to the North Ridge Road Cut Zone.

On the King Solomon Dome group of properties in the Yukon, field crews have completed soil and silt geochemical surveys on grids on the KSD, Dominion, Gold Run and Gulf properties that include close-spaced soil geochemical survey grids surrounding existing gold soil geochemical anomalies proximal to localities where previously collected grab and rock chip samples have returned values of up to 51.2 g/t Au - (See Feb. 3, 2011 news release).

At the KSD property, Kestrel geologists have also completed the first phase of a 1000 linear metre trenching, rock sampling and mapping program that was designed using existing geochemical, geological and geophysical data centred on and also along strike and adjacent to known gold-silver mineralization occurrences, including the Sheba and Mitchell veins.

Results from all the above-mentioned ongoing exploration programs will be released as they are received by the Corporation once compiled and interpreted and subjected to the necessary QA/QC procedures.

Cautionary Statements

This news release contains "forward-looking statements" within the meaning of applicable securities laws relating to certain explorations activities, including the contemplated future reporting of exploration results. Readers are cautioned to not place undue reliance on forward-looking statements. Forward-looking statements are based on certain key assumptions made by the Corporation, including assumptions related to sufficient financing and other resources to carry out planned exploration programs. Actual results and developments may differ materially from those contemplated by these statements depending on, among other things, insufficient funds or other resources to carry out the planned exploration programs. The forward-looking statements in this press release are made as of the date of this release and the Corporation undertakes no obligation to update publicly or revise any forward looking statements whether as a result of new information or otherwise, except as required by applicable securities laws. The Corporation undertakes no obligation to comment on analyses, expectations or statements made by third-parties in respect of the Corporation or its financial or operating results or (as applicable) their securities.

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this news release.


Contact Information


Kestrel Gold Inc.
Kevin Nephin
604-824-6056 or 604-799-2456
kvnephin@telus.net
www.kestrelgold.com


10 ago 2011

Malbex Q3 Update


TORONTO, ONTARIO--(Marketwire - Aug. 10, 2011) - Malbex Resources Inc. (TSX VENTURE:MBG) has filed its interim financial statements and MD&A for the three and nine months ended June 30, 2011 on SEDAR (www.sedar.com).

"Our technical team has made significant strides recently," said Tim Warman, President and CEO. "Our first-ever resource estimate on the gold-silver oxide discovery at Rojo Grande is advancing and should be completed by the end of Q4. Sample collection and preparation for the second round of metallurgical testing will commence in August, and preparations are well advanced for our next field season. We expect to complete some 15,000 metres of drilling, geophysical surveying and other exploration activities on our lead Del Carmen project beginning in October. Within the next few months we also hope to announce the acquisition of one or more early-stage South American gold exploration projects, augmenting our portfolio with projects that can be explored year-round."

Q3 and recent highlights:

* Completion of a 25-hole (5,538 metre) drill program at the flagship Del Carmen project during the 2010/2011 field season (November 2010 - April 2011). Significant results released since the Q2 report include:

Rojo Grande target

* hole 54 – 18.7 metres (m) at 0.79 grams per tonne (g/t) gold and 7.8 g/t silver
o and 62.9 m at 0.80 g/t gold and 11.4 g/t silver
* hole 55 – 104 m at 1.96 g/t gold and 25.2 g/t silver
o including 58 m at 2.95 g/t gold and 35.0 g/t silver
o and 67 m at 0.51 g/t gold and 1.5 g/t silver
* hole 56 – 14 m at 2.89 g/t gold and 45.4 g/t silver
* and 42 m at 1.10 g/t gold and 4.0 g/t silver

Cerro Amarillo target

* hole 53 – 27 m at 0.55 g/t gold and 2.0 g/t silver
o including 13 m at 0.85 g/t gold and 2.0 g/t silver

* Initiation of the first-ever National Instrument 43-101 resource estimate for the Rojo Grande target at Del Carmen Norte
* Working capital of $17.1 million and cash-on-hand of $17.6 million at June 30, 2011 (includes net proceeds of May 9, 2011 $15 million financing) compared with working capital of $11.3 million and cash-on-hand of $11.6 million at September 30, 2010

Further information on the Del Carmen project, including maps, sections and a complete assay table, can be accessed at www.malbex.ca/Projects/Del_Carmen.

Peter Stewart, PhD, Vice-President Exploration of Malbex Resources Inc., is a Professional Geoscientist in the Province of Ontario, and is the Qualified Person as defined by NI 43-101 responsible for the technical information presented in this news release.

About Malbex

Malbex Resources Inc. is a gold exploration company led by experienced management and directors. Malbex holds an indirect 100% interest in two exploration projects in Argentina's El Indio Gold Belt, which hosts over 35 million ounces of gold in past production and current reserves, including Barrick's Veladero and Pascua-Lama gold deposits. For more information, please visit www.malbex.ca.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements about strategic plans, spending commitments, future operations, results of exploration, anticipated financial results, future work programs, capital expenditures and objectives. Forward-looking information is necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information, including the risks identified in the Company's annual information form under the heading "Risk Factors". There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this press release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management as at the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contact Information



Malbex Resources Inc.
Tim Warman
President and Chief Executive Officer
(416) 628-0215

Malbex Resources Inc.
Marla Gale
VP Investor Relations
(416) 628-0215
ir@malbex.ca
www.malbex.ca


2 ago 2011

Troy Resources NL: Kamila Southeast Target Drilling Update-More High Grade Results


PERTH, WESTERN AUSTRAILA--(Marketwire - Aug. 1, 2011) - Troy Resources NL (TSX:TRY)(ASX:TRY) -

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES



* Drilling at the new Kamila Southeast Zone continues to produce encouraging high-grade gold-silver values:
o Hole CA-11-318 reported an interval of 8.25m at 8.33g/t gold and 817.8g/t silver or 20.02g/t Au_eq from 342.15m, downhole;
o Hole CA-11-323 produced an interval of 9.00m at 10.98g/t gold and 1320g/t silver or 29.84g/t Au_eq from 289.00m, downhole;
o Hole CA-11-325 returned an interval of 3.65m at 2.32g/t gold and 850g/t silver or 14.47g/t Au_eq from 302.50m, downhole;
o Hole CA-11-326 returned an interval of 11.2m at 2.66g/t gold and 539.98g/t silver or 10.37g/t Au_eq from 341.5m downhole.
* Mineralised zone remains open along strike, as well as up and down dip;
* Two rigs continue program of infill holes and step-outs to delineate mineralised zone within Inca Vein;
* Resource Estimate will be completed later in this quarter.

Troy Resources NL ("Troy") is pleased to announce further assay results from recently completed drilling at the Company's flagship Casposo gold and silver mine in San Juan, Argentina, which further delineate the new Kamila Southeast high grade gold-silver zone along strike and to the southeast of the existing Kamila Reserve.

Chief Executive Officer, Paul Benson said: "This recent drilling at Kamila Southeast has confirmed that we have one larger central high grade mineralised zone centred on holes CA-11-295 and CA-11-306 with a smaller second high grade shoot to the northwest defined by the CA-11-297 intercept. Additional Drilling is required to fill a drilling gap between the two.

"We remain on track to complete a Resource Estimate for this zone in this quarter and if the current delineation drilling is positive, a Mining Reserve by the end of the calendar year. Our objective then will be to determine if we can commence underground development earlier than currently planned. This would maintain production at higher levels and extend the mine life.

"Later in August we will reassign one of the rigs to recommence step-out drilling at Kamila Southeast beyond the current 400m long zone and test the remaining 1 kilometre of strike to the southeast."

Mr Benson said the man-portable drill has been repositioned and has commenced drilling on the one kilometre long outcropping Lucia Vein located 3 kilometres north of the plant. This rig will sequentially test the highest ranked drill targets from the numerous outcropping veins to the northeast of the Kamila structural corridor as well as the Castaño Nuevo and Don David Joint Ventures 23 kilometres to the north.

"In addition to a substantial drilling effort, an helicopter Magnetics and Radiometrics survey is scheduled to commence in late October and follow-up detailed grid based Ground Magnetics and Induced Polarization surveys will commence later this quarter to assist in delineating drill targets within the outcropping vein area north and northeast of the processing plant."

The new holes reported include a series of step-outs and infill holes from earlier reported gold–silver intercepts on the Inca Vein within the Kamila Southeast Extension Target, most of which intercepted the modelled Inca Vein surface as planned.

The Kamila Southeast Target was originally modelled as a series of three shoots from northwest to southeast centred on high grade intercepts in CA-11-297, CA-11-295 and CA-11-306.

The new drill holes have added significantly to the understanding of the Kamila Southeast Target and confirmed the high grade gold and silver values associated with the Inca Vein within the zone. Most importantly, it now appears that the two shoots modelled around holes CA-11-295 and CA-11-306 are in fact one larger mineralised zone with a second shoot to the northwest defined by the CA-11-297 intercept.

Additional holes are required to test the gap between the CA-11-297 shoot and the new Main Zone (see Figure 1, Figure 2 and Table 1). Intercepts include:

* CA-11-318: 342.15m – 350.40m: 8.25m grading 8.33g/t gold, 817.79g/t silver or 20.02g/t Au_eq Including :
* Upper interval: 342.15m – 344.95m: 2.80m at 17.23g/t gold, 965.5g/t silver or 31.03g/t Au_eq
* Lower interval: 347.85m – 350.40m: 2.55m at 7.78g/t gold, 1534.3g/t silver or 29.70g/t Au_eq;

* CA-11-319: 3.45m at 0.10g/t gold, 15.61g/t silver or 0.32g/t Au_eq from 413.45m;

* CA-11-320: 1.65m at 0.32g/t gold and 22.5g/t silver or 0.64g/t Au_eq from 246.8m

* CA-11-321: 2.00m at 0.09g/t gold, 9.3g/t silver or 0.22g/t Au_eq from 261.10m (Faulted);
* CA-11-322: 2.10m at 0.03g/t gold, 12.4g/t silver or 0.21g/t Au_eq from 358.60m (Lower Contact Faulted);

* CA-11-323: 9.00m at 10.98g/t gold and 1320.2g/t silver or 29.84g/t Au_eq from 289m;
* CA-11-324: 3.55m at 0.04g/t gold, 7.15g/t silver or 0.09g/t Au_eq from 305.9m;

* CA-11-325: 3.65m at 2.32g/t gold and 850.6g/t silver or 14.47g/t Au_eq from 302.5m.

* CA-11-326: 11.2m at 2.66g/t gold and 539.98g/t silver or 10.37g/t Au_eq from 341.5m including

* 9.9m at 2.99g/t gold and 602.62g/t silver or 11.59g/t Au_eq from 342.8m and
* 3.10m at 8.31g/t gold and 1433.7g/t silver or 28.7g/t Au_eq from 342.8m;

Drilling to date has focussed on the 430m zone adjacent to the post mineral dyke. The zone remains open along strike for one kilometre, as well as up and down dip.

To view Figure 1 and Figure 2, please click on the following link: http://media3.marketwire.com/docs/try81m.pdf

DRILL HOLE SUMMARIES:

CA-11-318: (2439530mE / 6547707mN/ Azimuth: 45° / Dip -63° / EoH: 380.60m):

Brief description of the Inca Vein Zone:

* 338.80m to 339.30m: Quartz-Pyrite-Epidote Brecciated and Banded Vein.
* 339.30m to 350.25m: Andesitic Crystal Tuff with Quartz-Pyrite Veinlets.
* 350.25m to 351.40m: Quartz-Pyrite–Black Sulphides -Brecciated.

Assays reported:

Overall Interval: 342.15m – 350.40m: 8.25m grading 8.33g/t gold, 817.79g/t silver or 20.02g/t Au_eq Including: Upper interval: 342.15m – 344.95m: 2.8m at 17.23g/t gold, 965.5g/t silver or 31.03g/t Au_eq And Lower interval: 347.85m – 350.40m: 2.55m at 7.78g/t gold, 1534.3g/t silver or 29.70g/t Au_eq

CA-11-319: (2439529.5E / 65477434.68N/ Azimuth: 45º/ Dip: -70º/ EoH: 447.5m):

Brief description of the Inca Vein Zone:

* 413.55m to 417.00m: Brecciated Quartz Vein - Black Sulphides - Brecciated Vein with Pyrite clusters and Trace Chalcopyrite.

Assays reported:

3.45m at 0.10g/t gold, 15.61g/t silver or 0.32g/t Au_eq from 413.45m

CA-11-320: (2439519E / 6547808N/ Azimuth: 45°/ Dip: -75°/ EoH: 324.0m):

Brief description of the Inca Vein Zone:

* 246.80m to 248.45m: Brecciated Quartz Vein with Black Sulphides.

Assays reported:

1.65m at 0.32g/t gold and 22.5g/t silver or 0.64g/t Au_eq from 246.8m

CA-11-321: (2439501.23E / 6547749.66N/ Azimuth: 45°/ Dip: -65°/ EoH: 401.0m):

Brief description of the Inca Vein Zone:

* 260.50m to 262.15m: Faulted and Brecciated Quartz Vein - Fine Bands with Black Sulphides - Ginguro Textures. Intercept above planned depth probably due to fault zone.

Assays reported:

2.00m at 0.09g/t gold, 9.3g/t silver or 0.22g/t Au_eq from 261.10m

CA-11-322: (2349444.0E / 6547764.0N/ Azimuth: 45°/ Dip: -75°/ EoH: 422.2m):

Brief description of the Inca Vein Zone:

* 358.60m to 360.1m: Stockworks Zone with Massive and Banded Quartz Vein.
* 360.10m to 360.4m: Massive to Banded Quartz Vein, with Black Sulphides and lower contact faulted.

Assays reported:

2.10m at 0.03g/t gold, 12.4g/t silver or 0.21g/t Au_eq from 358.60m.

CA-11-323: (2439501E/ 6547750.0N)/ Azimuth: 45° / Dip -68° / EoH: 317.6m):

Brief description of the Inca Vein Zone:

* 289.00m to 292.35m: Brecciated Quartz Vein with Colloform Banding.
* 292.35m to 293.50m: Brecciated Quartz Vein in Andesitic Tuff with Pyrite Disseminated and in Veinlets.
* 293.50m to 298.00m: Brecciated Quartz Vein - Colloform and Cockade Textures with Disseminated Chalcopyrite.

Assays reported:

9.00m at 10.98g/t gold and 1320.2g/t silver or 29.84g/t Au_eq from 289m

CA-11-324: (2439444E / 6547764N / Azimuth: 45°/ Dip: -65°/ EoH: 352.60m):

Brief description of the Inca Vein Zone:

* 297.82m to 306.90m: Andesite/Trachyte Dyke.
* 306.90m to 307.60m: Brecciated Quartz Vein within a Fault with Disseminated Pyrite.
* 307.60m to 309.45m: Stockworks Zone with Massive and Banded Quartz Veining.

Assays reported:

3.55m at 0.04g/t gold, 7.15g/t silver or 0.09g/t Au_eq from 305.9m

CA-11-325: (2439402.58E / 6547806.58N/ Azimuth: 45° / Dip: -63° / EoH: 332.50m):

Brief description of the Inca Vein Zone:

301.85m to 303.80m: Fault with Quartz Vein Fragments and Pyrite Disseminated and in Clusters.

303.80m to 304.35m: Brecciated Quartz Vein with Pyrite, Chalcopyrite, Silver and others Undifferentiated Black Sulphides.

304.35m to 305.25m: Massive Quartz Vein – Trace Sulphides.

305.25m to 306.15m: Brecciated Quartz Vein with Sulphides.

306.15m to 306.85m: Andesitic Crystal Tuff with Quartz Veinlets with Sulphides.

Assays reported:

3.65m at 2.32g/t gold and 850.6g/t silver or 14.47g/t Au_eq from 302.5m.

CA-11-326: (2439569.46E / 6547676.59N/ Azimuth: 45° / Dip: -63° /EoH: 372.40m):

Brief description of the Inca Vein Zone:

* 342.80m to 348.55m: Brecciated Quartz Vein with Colloform and Cockade Textures.
* 348.55m to 353.45m: Brecciated Quartz Vein with Chalcopyrite and Silver.

Assays reported:

11.2m at 2.66g/t gold and 539.98g/t silver or 10.37g/t Au_eq from 341.5m including; 9.9m at 2.99g/t gold and 602.62g/t silver or 11.59g/t Au_eq from 342.8m and 3.10m at 8.31g/t gold and 1433.7g/t silver or 28.7g/t Au_eq from 342.8m.

To view Table 1, please click on the following link: http://media3.marketwire.com/docs/try81t.pdf

Competent Person's Statement

Geological information in this Report has been compiled by Troy's Vice President Exploration & Business Development, Peter Doyle, who:

* Is a full time employee of Troy Resources NL
* Has sufficient experience which is relevant to the type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'
* Is a Fellow of the Australasian Institute of Mining and Metallurgy
* Has consented in writing to the inclusion of this data

Information of a scientific or technical nature in this report was prepared under the supervision of Peter J. Doyle, Vice President Exploration and Business Development of Troy, a "qualified person" under National Instrument 43-101 – "Standards of Disclosure for Mineral Projects", a Fellow of the Australasian Institute of Mining and Metallurgy. Mr. Doyle has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking, to qualify as a "qualified person" as defined in "National Instrument 43-101 – Standards of Disclosure for Mineral Projects". Mr Doyle has reviewed and approved the information contained in this report. For further information regarding the Company's projects in Brazil, Australia and Argentina, including a description of Troy's quality assurance program, quality control measures, the geology, samples collection and testing procedures please refer to the technical reports filed which are available under the Company's profile at www.sedar.com or on the Company's website.

Disclaimer: Forward-Looking Statements

This report contains forward-looking statements. These forward-looking statements reflect management's current beliefs based on information currently available to management and are based on what management believes to be reasonable assumptions. A number of factors could cause actual results, performance, or achievements to differ materially from the results expressed or implied in the forward-looking statements. Such factors include, among others, future prices of gold, the actual results of current production, development and/or exploration activities, changes in project parameters as plans continue to be refined, variations in ore grade or recovery rates, plant and/or equipment failure, delays in obtaining governmental approvals or in the commencement of operations.

ABOUT TROY RESOURCES

Troy Resources (TSX:TRY)(ASX:TRY) is a dividend-paying junior gold producer, with a clear growth strategy. The Company has two producing gold operations; Andorinhas Mine in Para State, Brazil and the Casposo gold and silver mine, in San Juan province, Argentina.

Troy has an experienced Board and management team with a track record of successful, fast-track mine development and low-cost operations.

Troy has an annual exploration budget in excess of $8 million and a proven track record in exploration discoveries and strategic acquisitions.

With the development of the Casposo project, Troy has entered a renewed growth phase which will again lift the Company's annual gold production above 100,000 ounces of gold per annum.

The Company is positioned to continue its path of strong growth and profitable operations, and is on track to achieve its vision of becoming a highly profitable mid-tier gold producer with a portfolio of quality long-life assets.

The Company maintains a robust balance sheet and forecasts continued strong cash flow from its current assets. Troy's gold production is unhedged; allowing its shareholders access to the full benefit of current and future gold price upside.

Troy is a responsible corporate citizen, committed to the best practice of health and safety, environmental stewardship and social responsibility.

ABN 33 006 243 750

Contact Information

*

Troy Resources NL
Mr Paul Benson
Chief Executive Officer
(61 8) 9481 1277
(61 8) 9321 8237 (FAX)
troy@troyres.com.au
www.try.com.au

Purple Communications
Annette Ellis / Warrick Hazeldine
Media Relations
(61 8) 6314 6300
aellis@purplecom.com.au



Barrick Reports Q2 2011 Financial and Operating Results


TORONTO, ONTARIO--(Marketwire - July 28, 2011) - Barrick Gold Corporation (NYSE:ABX)(TSX:ABX) -

SECOND QUARTER REPORT 2011

Based on IFRS and expressed in US dollars

For a full explanation of results, the Financial Statements and Management Discussion & Analysis, please see the Company's website, www.barrick.com.

Highlights

Financial and Operating Results

* Reported net earnings for Q2 rose 35% to $1.2 billion ($1.16 per share) from $859 million in the prior year period. Q2 adjusted net earnings increased 36% to a record $1.1 billion ($1.12 per share)1 from $824 million ($0.84 per share) in Q2 2010, reflecting higher realized gold and copper prices and higher gold sales volumes, resulting in an annualized return on equity of about 21%1.

* Q2 EBITDA increased 40% to $2.1 billion1 from $1.5 billion in the same prior year period. Q2 operating cash flow of $690 million and adjusted operating cash flow of $938 million1, respectively, were lower than the prior year operating cash flow of $1,108 million and adjusted operating cash flow of $1,127 million, respectively. This reduction was primarily as a result of higher income tax payments of $736 million, of which about $420 million was due to final 2010 income tax payments in a number of jurisdictions. Income tax payments are expected to be about $400 million per quarter in the subsequent quarters of 2011.

* Q2 gold production was 1.98 million ounces at total cash costs of $445 per ounce and net cash costs of $338 per ounce1. The Company is on track to meet its 2011 operating guidance of 7.6-8.0 million ounces at total cash costs of $450-$480 per ounce and lower expected net cash costs of $290-$320 per ounce2 compared to previous guidance of $340-$380 per ounce. Including Lumwana, Barrick expects to produce 455-475 million pounds of copper in 2011 at total cash costs of $1.55-$1.70 per pound.

* Gold and copper cash margins expanded significantly in the second quarter, highlighting Barrick's leverage to higher metal prices. Gold cash margins increased 33% to $1,068 per ounce1 from $804 per ounce in Q2 2010 and net cash margins rose 30% to $1,175 per ounce1 from $903 per ounce in the prior year period. Copper cash margins rose 39% to $2.51 per pound1 from $1.80 per pound in the prior year period.

Increasing Gold and Copper Reserves through Exploration and Selective Acquisitions

* Major exploration programs are advancing at Cortez, Turquoise Ridge, Ruby Hill, and Spring Valley in North America, on early stage targets in the El Indio belt in South America, and at Porgera and on regional targets in the Australia Pacific region.

* Barrick completed the acquisition of Equinox Minerals in July, adding two quality copper mines and increasing our leverage to strong copper prices while maintaining our gold exposure. Low cost financing has been secured and will enhance the returns from the acquisition. The Company is focused on three areas to realize the full potential of the Lumwana mine, which is located in one of the world's most prolific copper regions in Zambia: operational improvements and efficiencies, a focus on exploration to expand the resource, and an ongoing evaluation to determine the optimal scope of an expansion.

Investing in and Developing High Return Projects

* The mining industry is facing global cost trends which reflect a substantially higher commodity price environment, stronger local currencies, tighter labor markets and higher inflation in some regions compared to several years ago when many projects were at the feasibility stage. For Barrick, stronger metal prices have significantly improved project economics and overall rates of return despite higher estimated capital costs.

* At Pueblo Viejo, a major rainfall event that occurred in May requires remediation of the starter tailings dam and new permits for this facility. Primarily as a result of the unanticipated remediation work and impact to the schedule, mine construction capital for the project has increased to $3.6-$3.8 billion (100% basis) or $2.2-$2.3 billion (Barrick's 60% share) and first production is now expected to occur in mid-2012 subject to the receipt of these permits. As part of a longer-term, optimized power solution for Pueblo Viejo, the Company is advancing a plan to build a dual-fueled power plant at an estimated incremental capital cost of about $0.3 billion (100% basis). The new plant is expected to provide lower cost, long term power to the project.

* Capital costs for Pascua-Lama have been impacted by continued inflationary effects on costs for key consumable inputs and labor, re-estimations of materials such as steel, cement, fuel and equipment and increased expenditures to essentially maintain the schedule to deliver first production in mid-2013. As a result, pre-production capital is now estimated at $4.7-$5.0 billion.

* Pueblo Viejo and Pascua-Lama are anticipated to contribute 1.4-1.5 million ounces of average annual production over the first full five years of operation and to lower Barrick's overall total cash costs by about 20%3. At current metal prices, these two projects are expected to generate combined average annual EBITDA of about $2.8 billion4 to Barrick over the same period, with an average investment to EBITDA ratio of about 2.5 times.

FINANCIAL AND OPERATING RESULTS

Q2 production was 1.98 million ounces of gold at total cash costs of $445 per ounce and net cash costs of $338 per ounce. The Company is on track to achieve its full year operating guidance of 7.6-8.0 million ounces at total cash costs of $450-$480 per ounce and significantly lower expected net cash costs of $290-$320 per ounce compared to previous guidance of $340-$380 per ounce, positioning Barrick as one of the lowest cost senior gold producers. Q2 gold cash margins increased 33% to $1,068 per ounce from $804 per ounce in Q2 2010 and net cash margins increased 30% to $1,175 per ounce from $903 per ounce in the same prior year period. Second quarter copper cash margins increased 39% to $2.51 per pound from $1.80 per pound in the prior year period on higher copper prices. This margin expansion demonstrates the Company's exceptional leverage to higher metal prices.

Q2 adjusted net earnings rose 36% to a record $1.1 billion ($1.12 per share) compared to adjusted net earnings of $824 million ($0.84 per share) in the prior year period, reflecting higher realized prices for both gold and copper and higher gold sales volumes. Q2 adjusted net earnings translate to an annualized return on equity of about 21%. Q2 reported net earnings were $1.2 billion ($1.16 per share) before net adjustments of $42 million. Q2 EBITDA increased 40% to $2.1 billion from $1.5 billion in the same prior year period. Q2 operating cash flow of $690 million and adjusted operating cash flow of $938 million (which adjusts for the one-time operating cash flow impacts related to the Equinox acquisition) compares to operating cash flow of $1,108 million and adjusted operating cash flow of $1,127 million in the same prior year period, respectively. Operating cash flow and adjusted operating cash flow were negatively impacted by an increase in income tax payments, primarily due to final 2010 income tax payments in Argentina, Australia and Chile. Income tax payments totaled $736 million in the second quarter of 2011, of which about $420 million related to 2010 tax payments in the above jurisdictions compared to $245 million in the same prior year period. Based on current gold and copper prices, we expect income tax payments to be about $400 million per quarter for the remainder of 2011. In addition, we expect to make an intercompany dividend withholding tax payment of about $85 million in the third quarter.

"Operationally and financially, Barrick had a solid quarter, meeting our operating and cash cost targets which resulted in significant margin expansion and record financial results," said Aaron Regent, Barrick's President and CEO. "We also completed the acquisition and long term financing of Equinox which adds two attractive assets to our portfolio and another source of long term cash flow. Our project pipeline continues to progress with the ongoing construction of Pueblo Viejo and Pascua-Lama and while we are disappointed with the increased capital costs of these projects, their overall economics have improved significantly as a result of much higher gold and silver prices than originally forecasted."

The North America region continued to perform ahead of expectations in Q2, producing 0.92 million ounces at total cash costs of $404 per ounce, primarily due to strong performances from Cortez and Goldstrike. Cortez production of 0.42 million ounces at total cash costs of $220 per ounce in Q2 reflects the ramp up of leach pad production, increased mill throughput from de-bottlenecking and the processing of refractory ore at Goldstrike's facilities.

The Goldstrike operation exceeded plan in Q2, producing 0.30 million ounces at total cash costs of $511 per ounce on better than expected grades and more ore than anticipated from the open pit, which is anticipated to transition to a higher stripping phase in the second half of the year. Full year 2011 production for the North America region is expected to be 3.30-3.46 million ounces at total cash costs of $425-$450 per ounce.

The South American business unit produced 0.45 million ounces at total cash costs of $373 per ounce in Q2. The Lagunas Norte mine outperformed expectations, producing 0.18 million ounces at total cash costs of $267 per ounce on positive grade reconciliations. Veladero contributed 0.24 million ounces at total cash costs of $364 per ounce in Q2 and is on track to produce nearly 1.0 million ounces this year. In 2011, South America is expected to contribute 1.80-1.935 million ounces at total cash costs of $350-$380 per ounce.

The Australia Pacific business unit produced 0.46 million ounces at total cash costs of $611 per ounce in Q2. The Porgera mine, which produced 0.12 million ounces at total cash costs of $569 per ounce, was impacted by lower underground and open pit production as well as power outages and unplanned maintenance which affected mill throughput. Australia Pacific is expected to produce 1.85-2.00 million ounces at total cash costs of $610-$635 per ounce in 2011.

Attributable production from African Barrick Gold plc in Q2 was 0.13 million ounces at total cash costs of $652 per ounce. Barrick's share of 2011 production is expected to be 0.515-0.560 million ounces at total cash costs of $590-$650 per ounce.

Q2 copper production of 93 million pounds at total cash costs of $1.56 per pound included one month of production from the Lumwana mine in June. Utilizing option collar strategies, the Company has put in place floor protection on approximately 45% of its expected remaining copper production for 2011 at an average floor price of $3.27 per pound and can participate in upside up to an average ceiling price of about $4.85 per pound on approximately 55% of expected remaining 2011 production5. Barrick also has floor protection in place on approximately 45% of expected copper production for 2012 at an average floor price of about $3.75 per pound and can participate in upside up to an average ceiling price of about $5.50 per pound6 on approximately 40% of expected 2012 production. The Company's remaining copper production is subject to market prices. Following Barrick's acquisition of Equinox Minerals, the Company expects to produce 455-475 million pounds of copper in 2011 at total cash costs of $1.55-$1.70 per pound.

About 60% of Barrick's consolidated production costs are denominated in US dollars. The Company's largest single currency exposure is the Australian dollar/US dollar exchange rate. Barrick is 92% hedged on its expected remaining Australian operating and capital expenditures in 2011 at an effective average rate of $0.76 and has substantial coverage for the following three years at rates at or below $0.75.

The Company has also mitigated the impact of higher oil prices through the use of financial contracts and production from Barrick Energy such that a $10 change in WTI crude oil prices is only expected to impact 2011 total cash costs by about $1 per ounce. The Barrick Energy contribution, along with the financial contracts, provides hedge protection for approximately 85% of expected remaining 2011 fuel consumption. Beyond 2011, financial contracts provide substantial hedge coverage in 2012 and 2013 and production from Barrick Energy is expected to continue to provide long term natural offsets to expected energy costs.

INCREASING GOLD AND COPPER RESERVES THROUGH EXPLORATION AND SELECTIVE ACQUISITIONS

Barrick completed the acquisition of Equinox Minerals in July and is in the process of integrating the Lumwana mine and Jabal Sayid project into the Australia Pacific regional business unit. This transaction has added two quality copper mines to our portfolio and improves our copper leverage while maintaining our exposure to gold. Low cost financing has been secured and will further enhance returns from the acquisition. The Equinox transaction was a unique opportunity to acquire a large, producing asset in an environment of strong copper fundamentals. The Lumwana mine is a high quality, long-life mine with significant expansion and resource growth potential and provides us with a major presence in Zambia, one of the most prospective copper regions in the world.

The Company is focused on three areas to realize the full potential of Lumwana and maximize long term cash flows: operational improvements and efficiencies, a focus on exploration to materially expand the resource and an ongoing evaluation to determine the optimal size of the expansion.

Lumwana is expected to produce 155-175 million pounds at total cash costs of $1.75-$1.95 per pound from June 1 to the end of 2011. On a full year annualized basis, production is expected to be about 300 million pounds beyond 2011 prior to a potential expansion. Cash costs for 2011 have been impacted by plant availability and lower grades related to dilution, as well as higher costs related to currency, labor and power. Areas of expected operating improvements include mill de-bottlenecking, pit re-optimization, changes to mine sequencing, dilution control, and benefits from higher equipment availability and leveraging Barrick's supply chain agreements. An infill drill program at the producing Malundwe deposit is underway to improve dilution control and more accurately model orebody characteristics.

Lumwana has excellent potential for both brownfield and greenfield resource growth. Barrick expects to spend over $50 million in 2011 as part of an 18 month exploration program to increase the measured and indicated resource as part of the expansion study which is expected to be completed in the second half of 2012. As a result, the Company's total exploration budget for 2011 will increase to $370-$390 million7, of which approximately 40% will be capitalized. A minimum of 16 drill rigs are planned to be added in Zambia, primarily at the development stage Chimiwungo deposit, to convert mineralized inventory and inferred resources to the measured and indicated category, conduct extensional drilling, infill drill two potential starter pits and evaluate the potential for a third starter pit. Malundwe is open to the north and south and Chimiwungo remains open in multiple directions. Recent condemnation drilling west of the current optimized Chimiwungo pit shell is intersecting typical "Chimi-style" mineralization. Wide spaced drilling is planned for the recent Mutoma discovery as well as drilling to test advanced sediment-hosted copper-gold targets elsewhere on the Lumwana Mining Lease and on other exploration properties in Zambia including the copper belt. In addition, Barrick is advancing an expansion study that could potentially double processing rates in conjunction with the exploration program to better determine the optimal scope of the operation.

The Jabal Sayid copper project in Saudi Arabia is expected to enter production in the second half of 2012 at a total capital cost of approximately $400 million, of which $275 million remains to be spent. The mine is expected to produce 100-130 million pounds annually over its first full five years. Good potential exists for material extensions to known deposits and new discoveries from an ongoing evaluation of the entire Jabal Sayid site. Current exploration is focused on testing Lode 4 at depth, where mineralization has been intersected in several previous drill holes, including an intercept of 111 meters at 2.67% copper. Several geophysical surveys are also in progress.

INVESTING IN AND DEVELOPING HIGH RETURN PROJECTS IN CONSTRUCTION

Barrick has targeted growth in production to 9 million ounces of gold8 within the next five years. Total cash costs are expected to benefit from its large, low cost projects, primarily Pueblo Viejo and Pascua-Lama, as these mines come on stream. Once at full capacity, these two mines are expected to contribute about 1.4-1.5 million ounces of average annual production over the first full five years of operation and are expected to lower Barrick's overall total cash costs by about 20%. At current metal prices, these two projects are anticipated to generate combined average annual EBITDA of about $2.8 billion to Barrick over the same period.

"The mining industry has been impacted by global cost trends which are a product of a higher commodity price environment, stronger local currencies, tighter labor markets and higher inflation," said Peter Kinver, Executive Vice-President and Chief Operating Officer. "While Barrick has not been immune to these trends, the higher metal prices have significantly improved the economics and overall rates of return for these projects despite the higher than previously estimated capital costs."

At the Pueblo Viejo project in the Dominican Republic, overall construction is now more than 70% complete. A major rainfall event that occurred in May requires remediation of damage to the partially constructed starter tailings dam facility and as a result, first production is now anticipated in mid-2012, subject to the receipt of new tailings permit approvals. The unanticipated remediation work and impact on the schedule has resulted in mine construction capital increasing to $3.6-$3.8 billion (100%)9, or $2.2-$2.3 billion (Barrick's 60% share) of which about 75% had been committed at the end of the second quarter. Barrick's share of annual gold production in the first full five years of operation is expected to average 625,000-675,000 ounces at total cash costs of $275-$300 per ounce9. At the current gold price of about $1,600 per ounce, Pueblo Viejo is expected to contribute approximately $900 million of average annual EBITDA to Barrick over this period, representing an investment to EBITDA ratio of about 2.5 times.

At the end of the second quarter, three of the four autoclaves had been brick-lined and the remaining autoclave is more than 70% complete. About 90% of the planned concrete has been poured, approximately 90% of the steel has been erected and more than 4.8 million tonnes of ore have been stockpiled. Work continues toward achieving key milestones including the connection of power to the site. As part of a longer-term, optimized power solution for Pueblo Viejo, the Company is advancing a plan to build a dual-fueled power plant at an estimated incremental capital cost of about $300 million (100% basis) or $180 million (Barrick's share) that would commence operations utilizing heavy fuel oil (HFO) power but have the ability to subsequently convert to cheaper liquid natural gas (LNG). The new plant is expected to provide lower cost, long term power to the project.

Since February 2011, Barrick has reorganized its Capital Projects group, increasing the involvement and co-ordination of its Regional Business Units in the construction of major projects to assist in operational readiness and to capture regional synergies. As a result, personnel changes were made at the Pascua-Lama project. In connection with these changes, a detailed review of the underlying assumptions and trending analysis for Pascua-Lama was completed in the second quarter. This review coincided with the review of the capital costs of Cerro Casale, where additional data and information applicable to Pascua-Lama was identified. The Company has concluded that, based on current trends, certain earlier estimates and assumptions are not achievable, including those for productivity rates and inflationary effects on costs, as well as for required quantities of certain construction materials such as steel and cement. In addition, the Company has increased its projected expenditures to essentially maintain the schedule for bringing the project into production in mid-2013. As a result, pre-production capital is now estimated at $4.7-$5.0 billion10. Included in this estimate is a contingency of $350-$650 million which is about 15%-25% of the remaining uncommitted expenditure of about $2.5 billion. Barrick has engaged an independent, globally recognized engineering consultant who has reviewed the robustness of our processes and methodology in deriving this updated capital estimate. Approximately 40% of the capital had been committed at the end of the second quarter for items including structural steel, the mining fleet, autogenous and ball mills, the overland conveyor and the primary and pebble crushers.

Since the 2009 feasibility study (which estimated pre-production capital at $2.8-$3.0 billion), costs for key consumables have increased materially. Since the beginning of 2009, steel prices are up about 100%, oil prices have increased about 120% and copper prices are up more than 200%. Projects in Chile and Argentina are also being adversely affected by the continued increase in demand for project resources due to the large number of projects that are in construction or at the feasibility stage. High inflation rates of over 25% in Argentina, as well as the earthquake in Chile, have resulted in significantly higher labor costs and a tight labor market, and a stronger Chilean peso has negatively impacted cost estimates. These inflationary pressures represent approximately 50% of the increased estimated capital expenditures over the 2009 study.

Based on construction experience to date, we have re-estimated quantities of material required for such items as steel, cement, fuel and equipment, which represents approximately 35% of the increased estimated capital expenditures over the 2009 study.

Given lower than expected productivity levels, the Company has increased expenditures to essentially maintain the schedule for the project in order to deliver first production in mid-2013, including expanded camp facilities and the higher costs associated with winter construction. These increased expenditures represent approximately 15% of the increased estimated capital expenditures over the 2009 study.

Pascua-Lama is a high quality, world class resource. Expected average annual gold production for Pascua-Lama has increased to 800,000–850,000 ounces in the first full five years of operation at negative total cash costs of $225-$275 per ounce10 assuming a silver price of $25 per ounce. Average annual silver production for the first full five years is expected to be about 35 million ounces. For every $1 per ounce increase in the silver price, total cash costs are expected to decrease by about $35 per ounce over this period. At current commodity prices of $1,600 per ounce gold and $40 per ounce silver, Pascua-Lama is expected to generate approximately $1.9 billion of average annual EBITDA in its first full five years of operation. At today's prices, this represents an investment to EBITDA ratio of about 2.6 times.

At the end of the second quarter, engineering design was about 90% complete. In Chile, earthworks were more than 80% complete, the truck shop platform was completed and work advanced on road construction to the Pascua pit. In Argentina, platforms for the conveyor portal, coarse ore stockpile, pebble crusher and Merrill Crowe facility were completed. Occupancy and expansion of the construction camps in Chile and Argentina continues to ramp up with more than 2,300 housed on site and a further 2,800 expected by the end of the year. Preparations are underway to commence pre-strip mining in Q4 2011 and development of the tunnel connecting the mine in Chile and the processing plant in Argentina is progressing on both sides.

PROJECTS IN FEASIBILITY

A capital review has been completed for the Cerro Casale project in Chile that incorporates design changes resulting from advanced engineering and a review of recent industry projects, and which has resulted in a more robust and lower risk technical design. Estimated pre-production capital of about $6.0 billion (100% basis)11, which includes a higher contingency of about $0.9 billion, has been impacted by inflationary effects on costs for key consumable inputs and labor, re-estimations of required quantities of construction materials, increased costs related to productivity, and higher expenditures for expanded temporary camps and other facilities. The revised estimate is based on updated commodity price assumptions and also reflects the impact of a stronger Chilean peso and tight labor markets in Chile. The feasibility study was based on 2009 prices, exchange rates and labor conditions.

Inflationary and other impacts on labor and consumables such as steel and cement, which have increased costs for structural work, represent approximately 25% of the increased estimated capital expenditures over the 2009 study. Based on a review of recent industry projects, we have re-estimated costs for items such as mechanical and electrical work and quantities of other materials, which accounts for approximately 20% of the increased estimated capital expenditures. We have also increased projected expenditures related to lower than anticipated productivity based on construction experience to date at Pascua-Lama and these higher expenditures represent approximately 20% of the increased estimated capital expenditures. In connection with the current labor environment, we have expanded the temporary camps and facilities, which accounts for approximately 10% of the increased estimated capital expenditures. A provision for a higher contingency represents approximately 25% of the increase.

Barrick is evaluating several options to further optimize the project and the potential for higher grade satellite starter pits. Exploration programs will continue in parallel with advancing detailed engineering and permitting. The Environmental Impact Assessment is expected to be submitted shortly and the permitting process is anticipated to be about 18 months, at which time Barrick would consider a construction decision. Discussions with the government and meetings with local communities and indigenous groups are continuing in parallel with these activities. Barrick's 75% share of average annual production is anticipated to be about 750,000-825,000 ounces of gold and 190-210 million pounds of copper in the first full five years of operation at lower total cash costs than previously estimated of about $125-$175 per ounce11.

At the 50%-owned Donlin Gold project in Alaska, feasibility study revisions that include updated costs and the utilization of natural gas are expected to be completed and submitted to the Board of Donlin Gold LLC in the second half of 2011.

At the Reko Diq copper-gold project in which Barrick holds a 37.5% interest, the Supreme Court of Pakistan has ruled that the provincial government of Balochistan has the authority to decide to grant a mining license to the project company, Tethyan Copper. Efforts to secure the mining license and associated Project and Mineral Agreements are expected to continue in the second half of 2011.

A peer review of the draft Social, Environmental Impact Assessment (SEIA) report for the 50%-owned Kabanga project in Tanzania was completed during the quarter and is expected to be finalized along with the feasibility study in the second half of 2011. Focus will shift in the approval phase to gaining the required Tanzanian regulatory approvals and negotiating an acceptable Mineral Development Agreement with the Tanzanian government.

Barrick's vision is to be the world's best gold company by finding, acquiring, developing and producing quality reserves in a safe, profitable and socially responsible manner. Barrick's shares are traded on the Toronto and New York stock exchanges.

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION

Certain information contained in this Second Quarter Report 2011, including any information as to our strategy, projects, plans or future financial or operating performance and other statements that express management's expectations or estimates of future performance, constitute "forward-looking statements". All statements, other than statements of historical fact, are forward-looking statements. The words "believe", "expect", "will", "anticipate", "contemplate", "target", "plan", "continue", "budget", "may", "intend", "estimate" and similar expressions identify forward -looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The Company cautions the reader that such forward -looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual financial results, performance o r achievements of Barrick to be materially different from the Company's estimated future results, performance or achievements expressed or implied by those forward-looking statements and the forward-looking statements are not guarantees of future performance. These risks, uncertainties and other factors include, but are not limited to: the impact of global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future cash flows; changes in the worldwide price of gold, copper or certain other commodities (such as silver, fuel and electricity); fluctuations in currency markets; changes in U.S. dollar interest rates; risks arising from holding derivative instruments; the ability of the Company to complete or successfully integrate an announced acquisition proposal; legislative, political or economic developments in the jurisdictions in which the Company carries on business, including Zambia and Saudi Arabia; operating or technical difficulties in connection with mining or development activities; employee relations; availability and costs associated with mining inputs and labor; the speculative nature of exploration and development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves; changes in costs and estimates associated with our projects; adverse changes in our credit rating, level of indebtedness and liquidity, contests over title to properties, particularly title to undeveloped properties; the organization of our previously held African gold operations under a separate listed entity; the risks involved in the exploration, development and mining business. Certain of these factors are discussed in greater detail in the Company's most recent Form 40-F/Annual Information Form on file with the U.S. Securities and Exchange Commission and Canadian provincial securities regulatory authorities.

The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law.

Contact Information

*

INVESTOR CONTACT: Deni Nicoski
Vice President, Investor Relations
(416) 307-7410
dnicoski@barrick.com

MEDIA CONTACT: Andy Lloyd
Senior Manager, Communications
(416) 307-7414
alloyd@barrick.com



26 jul 2011

Terreno Resources Corp. Announces Increase to Private Placement


TORONTO, ONTARIO--(Marketwire - July 25, 2011) - Terreno Resources Corp. (TSX VENTURE:TNO) (the "Company") reports that further to the Company's news release dated July 15, 2011, the Company has increased the non-brokered private placement of Units at $0.15 per Unit (each a "Unit") from 10,000,000 units to 14,000,000 units for aggregate proceeds of $2,100,000. As previously disclosed, each Unit is comprised of one common share and one half share purchase warrant. Each full purchase warrant (a "Warrant") entitles the holder to acquire one additional common share for a period of two years at a price of $0.25.

A finder's fee of 7% of the proceeds placed payable in cash and 7% of the Units placed payable in Warrants is payable on portions of the placement to registered agents/brokers.

Proceeds of the placement will be applied to the Company's gold, copper and silver projects in Argentina, the phosphate and potash projects in Brazil (subject to closing the transaction detailed in a press release dated April 20, 2011) in addition to general working capital.

It is currently anticipated that subscribers to the Offering will include insiders and/or control persons of Terreno or their affiliates.

The Offering is subject to the approval of the TSX Venture Exchange and all securities issued will be subject to a standard four-month hold period.

About Terreno Resources

Terreno, meaning "of the earth" in Spanish, represents the Company's focus on natural resource opportunity development in South America. Terreno has option agreements on three exploration projects in Argentina; La Poposa (formerly referred to as Amarillo) in San Juan, Socompa and Trigal in Salta. All three projects boast significant alteration systems and have the potential for copper, gold and silver mineralization. For more information, please visit www.terrenoresources.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contact Information

*

Terreno Resources
Philip Williams, CFA
President and CEO
416.643.7631



21 jul 2011

Troy Resources NL: Kamila Southeast Target Drilling Continues to Deliver High Grade Results


PERTH, WESTERN AUSTRALIA--(Marketwire - July 19, 2011) - Troy Resources NL (TSX:TRY)(ASX:TRY) -

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES


* Drilling along strike and southeast of Kamila Reserve extends new, high-grade gold-silver mineralised zone.
o Hole CA-11-316 reported an interval of 3.45m at 21.59g/t gold and 1240.35g/t silver or 39.30g/t Au_eq from 315.35m, downhole;
o Hole CA-11-317 reported an interval of 2.0m at 10.99g/t gold and 312.50g/t silver or 15.45g/t Au_eq from 323.50m downhole.
* Mineralised zone remains open along strike, as well as up and down dip.
* Second Rig added to program in late June to complete Infill drilling targeting Resource estimate in September quarter.

Troy Resources NL ("Troy") is pleased to announce further assay results from recently completed drilling at the Company's flagship Casposo gold and silver mine in San Juan, Argentina, which continue to extend the new high grade gold-silver mineralised zone along strike and to the southeast of the existing Kamila Reserve.

The new holes include a series of step-outs and infill holes from earlier reported gold–silver intercepts on the Inca Vein within the Kamila Southeast Extension Target, most of which intercepted the modelled Inca Vein surface as planned.

The new intercepts have added significantly to the understanding of the Kamila Southeast Target and continue to confirm the high grade gold and silver values associated with the Inca Vein within the zone (see Figure 1, Figure 2 and Table 1). Intercepts include:

* CA-11-314: 0.5m at 4.70g/t gold and 104.0g/t silver or 6.19g/t Au_eq from 338.8m and 1.15m at 3.95g/t gold and 14.83g/t silver or 4.16g/t Au_eq from 350.25m downhole;
* CA-11-315: overshot the modelled pierce point Inca Vein target and this resulted in no significant assays;
* CA-11-316: 3.45m at 21.59g/t gold and 1240.35g/t silver or 39.30g/t Au_eq from 315.35m, including 0.90m at 59.19g/t gold and 3751g/t silver or 112.78g/t Au_eq from 315.35m downhole;
* CA-11-317: 2m at 10.99g/t gold and 312.50g/t silver or 15.45g/t Au_eq from 323.50m downhole.

Drilling to date has focussed on the 430m zone adjacent to the post mineral dyke. The zone remains open along strike for one kilometre, as well as up and down dip.

Chief Executive Officer, Paul Benson said: "Our current objective is to complete the drilling required for a Resource Estimate on this new zone in the September quarter and if the infill drilling is positive, a Mining Reserve by the end of the calendar year."

"Our focus in the coming months will be to determine if we can prove up sufficient high grade material to justify commencing underground development earlier than currently planned."

Mr Benson said the man-portable drill has been repositioned and has commenced drilling on the one kilometre long outcropping Lucia Vein located 3 kilometres north of the plant. This rig will sequentially test the highest ranked drill targets from the numerous outcropping veins to the northeast of the Kamila structural corridor as well as the Castaño Nuevo and Don David Joint Ventures 23 kilometres to the north.

"In addition to a substantial drilling effort, a contract has been awarded for detailed helicopter magnetics and a radiometric survey over the Casposo Property and the JV areas. Follow-up ground magnetics and Induced Polarization surveys will also be undertaken to assist in delineating covered drill targets."

DRILL HOLE SUMMARIES:

CA-11-314: (2439632.1E-6547632.58N/45°/-60°/ 455.0m):

Brief description of the Inca Vein Zone:

* 338.80m to 339.30m: Quartz-Pyrite-Epidote Brecciated and Banded Vein.
* 339.30m to 350.25m: Andesitic Crystal Tuff with Quartz-Pyrite Veinlets.
* 350.25m to 351.40m: Quartz-Pyrite–Black Sulphides -Brecciated.

Assays reported: 0.5m at 4.70g/t gold and 104.0g/t silver or 6.19g/t Au_eq from 338.8m and 1.15m at 3.95g/t gold and 14.83g/t silver or 4.16g/t Au_eq from 350.25m

CA-11-315: (2439632.1E-6547632.58N/45°/-45°/ 359.5m):

Brief description of the Inca Vein Zone:

* 280.00m to 281.15m: Tectonic Breccia containing Pyrite-Calcite-Quartz Veinlets and Black Sulphides.
* 281.15m to 286.90m: Brecciated Rhyolite with Calcite Veinlets containing Black Sulphides and Pyrite as Both Disseminated Sulphides and as Clusters.

No significant values were reported.

CA-11-316: (2439530.86E-6547707.54N/45°/-61°/ 337.50m):

Brief description of the Inca Vein Zone:

* 280.30m to 291.70m: Andesitic Crystal Tuff with Rare Banded Quartz Veins.
* 291.70m to 292.30m: Minor Quartz-Calcite-Pyrite Vein, Fine Banded and Breccia textures with Black Sulphides.
* 292.30m to 314.25m: Andesitic Crystal Tuff Moderate Silicification/Quartz Veining.
* 314.25m to 314.60m: Minor Fault Zone with Argillic Alteration.
* 314.60m to 315.35m: Andesitic Crystal Tuff.
* 315.35m to 318.75m: Main Vein Zone Include:
* 315.35m to 316.20m: Brecciated, Banded Texture Vein with Black Sulphides, Pyrite-Chalcopyrite, and Native Silver.
* 316.20m to 318.50m: Quartz Vein - Banded and Massive Textures.
* 318.50m to 318.75m: Breccia - Andesite and Quartz Vein Fragments.
* 318.75m to 321.70m: Andesitic Crystal Tuff with Quartz-Pyrite Veinlets with Local Stockworks.

Assays reported: 3.45m at 21.59g/t gold and 1240.35g/t silver or 39.30g/t Au_eq from 315.35m, including 0.90m at 59.19g/t gold and 3751g/t silver or 112.78g/t Au_eq from 315.35m.

CA-11-317: (2439529.54E-6547743.68N/45°/-65°/ 353.50m):

Brief description of the Inca Vein Zone:

* 321.05m to 324.50m: Main Vein Zone including:
* 321.05m to 322.50m: Brecciated, Banded Quartz Vein within Silicified Andesite.
* 322.50m to 323.30m: Brecciated, Minor Banded Quartz Vein with Black Sulphides and Pyrite.
* 323.30m to 324.50m: Banded to Massive Textured Vein with Minor Fine Banded Black Sulphides.
* 324.50m to 353.50m: Andesitic Crystal Tuff with Banded Quartz Veins and Calcite Veins.

Assays reported: 2m at 10.99g/t gold and 312.50g/t silver or 15.45g/t Au_eq from 323.50m

Competent Person's Statement

Geological information in this Report has been compiled by Troy's Vice President Exploration & Business Development, Peter Doyle, who:

* Is a full time employee of Troy Resources NL
* Has sufficient experience which is relevant to the type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'
* Is a Fellow of the Australasian Institute of Mining and Metallurgy
* Has consented in writing to the inclusion of this data

Information of a scientific or technical nature in this report was prepared under the supervision of Peter J. Doyle, Vice President Exploration and Business Development of Troy, a "qualified person" under National Instrument 43-101 – "Standards of Disclosure for Mineral Projects", a Fellow of the Australasian Institute of Mining and Metallurgy. Mr. Doyle has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking, to qualify as a "qualified person" as defined in "National Instrument 43-101 – Standards of Disclosure for Mineral Projects". Mr Doyle has reviewed and approved the information contained in this report. For further information regarding the Company's projects in Brazil, Australia and Argentina, including a description of Troy's quality assurance program, quality control measures, the geology, samples collection and testing procedures please refer to the technical reports filed which are available under the Company's profile at www.sedar.com or on the Company's website.

Disclaimer: Forward-Looking Statements

This report contains forward-looking statements. These forward-looking statements reflect management's current beliefs based on information currently available to management and are based on what management believes to be reasonable assumptions. A number of factors could cause actual results, performance, or achievements to differ materially from the results expressed or implied in the forward-looking statements. Such factors include, among others, future prices of gold, the actual results of current production, development and/or exploration activities, changes in project parameters as plans continue to be refined, variations in ore grade or recovery rates, plant and/or equipment failure, delays in obtaining governmental approvals or in the commencement of operations.

ABOUT TROY RESOURCES

Troy Resources (TSX:TRY)(ASX:TRY) is a dividend-paying junior gold producer, with a clear growth strategy. The Company has two producing gold operations; Andorinhas Mine in Para State, Brazil and the Casposo gold and silver mine, in San Juan province, Argentina.

Troy has an experienced Board and management team with a track record of successful, fast-track mine development, low-cost operations, exploration discoveries and strategic acquisitions.

With the development of Casposo, Troy is entering a renewed growth phase which will again lift the Company's annual gold production above 100,000 ounces of gold per annum.

Troy has an annual exploration budget in excess of $8 million, and is well positioned to continue its path of strong growth and profitable operations. The Company is on track to achieve its vision of becoming a highly profitable mid-tier gold producer with a portfolio of quality long-life assets.

The Company maintains a robust balance sheet and forecasts continued strong cash flow from its current assets. Troy's gold production is unhedged; allowing its shareholders access to the full benefit of current and future gold price upside.

Troy is a responsible corporate citizen, committed to the best practice of health and safety, environmental stewardship and social responsibility.

ABN 33 006 243 750

To view Figures 1 and 2, Table 1 and a map of Project Locations, please visit the following link: http://media3.marketwire.com/docs/tryi719.pdf.

Contact Information



Troy Resources NL
Mr Paul Benson
Chief Executive Officer
(61 8) 9481 1277
(61 8) 9321 8237 (FAX)
troy@troyres.com.au
www.troyres.com.au

Purple Communications
Annette Ellis
Media Relations
(61 8) 6314 6300
aellis@purplecom.com.au

Purple Communications
Warrick Hazeldine
Media Relations
(61 8) 6314 6300